6 megawatts of generator power, paralleling switchgear, distributed at 5kV thru 5-unit substations, 65 transfer switches, automated monitoring and control
Three main service electrical switchgear vaults
Complete distribution and risers servicing 58 electrical closets throughout the building
Final testing and commissioning of entire installation including complete blackout test of entire building